6 operation errors easily damage the mesh chain conveyor
2022 03/09
1, network chain conveyor initial feeding, should gradually increase the feeding speed until reaching the rated conveying capacity, feeding should be uniform, otherwise easy to cause the accumulation of conveying material plug, driving device overload, so that the whole machine premature damage.
2, the conveying material shall not be mixed with hard large material to avoid screw stuck and caused by the damage of the screw machine.
3. Abnormal phenomena occurring in the operation of the network chain conveyor should be checked and eliminated, and shall not be forced to operate.
4. In use, often inspect the working state of each part of the screw machine, pay attention to whether the fasteners are loose. If the parts are loose, the screws should be tightened immediately to retighten them.
5, the network chain conveyor should be no load starting, that is, in the shell no material starting, starting to screw machine feeding.
6, the movement of the network chain conveyor should often add lubricating oil.